Search
Add filters:
Use filters to refine the search results.
Results 1-2 of 2 (Search time: 0.002 seconds).
- previous
- 1
- next
Item hits:
Title | Author(s) | Source | Page(s) |
---|---|---|---|
Mathematical modeling for production system with backlogging and failure in repair | Chiu, Singa Wang; Chiu, Yuan-Shyi Peter | JSIR Vol.65(06) [June 2006] | 499-506 |
Determining expedited time and cost of the end product with defective component parts using critical path method (CPM) and time-costing method | Chiu, Singa Wang; Chiu, Yuan-Shyi Peter; Shih, Chih-Chang | JSIR Vol.65(09) [September 2006] | 695-701 |
Discover
Subject
Date issued
- 2 2006