Please use this identifier to cite or link to this item:
http://nopr.niscair.res.in/handle/123456789/755
Title: | Effect of shortage level constraint on finite production rate model with rework |
Authors: | Chiu, Yuan-Shyi Peter Chiu, Singa Wang Chao, Huang-Chieh |
Keywords: | Defects;Finite production rate;Manufacturing;Rework;Scrap;Shortage level constraint |
Issue Date: | Feb-2008 |
Publisher: | CSIR |
Abstract: | Long run average costs for finite production rate model with backlogging is less than or equal to that of the same model without backlogging. An equation for calculating intangible backorder cost is proposed for situation when required service level is not attainable. By incorporating this intangible backorder cost in mathematical analysis, one can derive a new optimal lot-size policy that minimizes expected total costs as well as satisfies the shortage level constraint. |
Page(s): | 112-116 |
URI: | http://hdl.handle.net/123456789/755 |
ISSN: | 0022-4456 |
Appears in Collections: | JSIR Vol.67(02) [February 2008] |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
JSIR 67(2) (2008) 112-116.pdf | 117.05 kB | Adobe PDF | View/Open |
Items in NOPR are protected by copyright, with all rights reserved, unless otherwise indicated.