Please use this identifier to cite or link to this item: http://nopr.niscair.res.in/handle/123456789/4326
Full metadata record
DC FieldValueLanguage
dc.contributor.authorKolahan, Farhad-
dc.contributor.authorSharifinya, Ahmad-
dc.date.accessioned2009-05-26T12:30:41Z-
dc.date.available2009-05-26T12:30:41Z-
dc.date.issued2009-06-
dc.identifier.issn0022-4456-
dc.identifier.urihttp://hdl.handle.net/123456789/4326-
dc.description496-504en_US
dc.description.abstractThis paper addresses integrated job scheduling and tool replacement problems in a single machine environment withobjectives to determine optimal job sequence, tool selection for operation, tool replacement schedule, and number of spares foreach tool type, in such a way that total expected production cost is minimized. Since problem is NP-hard, a hybrid algorithm[Tabu-simulated annealing (SA)] is proposed to simultaneously provide job sequencing, tool replacement intervals and number ofspare tools required. Tabu-SA is examined and results are compared by solving a real-sized example problem.en_US
dc.language.isoen_USen_US
dc.publisherCSIRen_US
dc.sourceJSIR Vol.68(06) [June 2009]en_US
dc.subjectCombinatorial optimizationen_US
dc.subjectReliabilityen_US
dc.subjectSchedulingen_US
dc.subjectTabu-SA algorithmen_US
dc.subjectTool replacementen_US
dc.titleSimultaneous job scheduling and tool replacement based on tool reliability byproposed Tabu-SA algorithmen_US
dc.typeArticleen_US
Appears in Collections:JSIR Vol.68(06) [June 2009]

Files in This Item:
File Description SizeFormat 
JSIR 68(6) 496-504.pdf132.54 kBAdobe PDFView/Open


Items in NOPR are protected by copyright, with all rights reserved, unless otherwise indicated.