Browsing by Author Cheng, Feng-Tsung
Showing results 1 to 2 of 2
Title | Author(s) | Source | Page(s) |
---|---|---|---|
Optimal common cycle time for a multi-item production system with discontinuous delivery policy and failure in rework | Chiu, Yuan-Shyi Peter; Lin, Hong-Dar; Cheng, Feng-Tsung; Hwang, Ming-Hon | JSIR Vol.72(07) [July 2013] | 435-440 |
Replenishment lot sizing with failure in rework and an enhanced multi-shipment policy | Chiu, Yuan-Shyi Peter; Wu, Mei-Fang; Cheng, Feng-Tsung; Hwang, Ming-Hon | JSIR Vol.73(10) [October 2014] | 648-652 |